In Mains Supply mode-it allows unrestricted supply to the load.
In Generator Supply mode Its electronic circuit will continuously monitor the load/current. As the current value exceeds the preset value for more than 7-8 sec. (T 1) , Current Limiting Device will trip the power supply for predetermined time 10-30 sec.(T 2) & then it will switch ON the power supply again & start Monitoring the load current again & the whole process will restart.
Lockout cycle for overload limiter will be 5-10 cycles.(optional/user defined).
The automatic device panel shall be totally enclosed, metallic, rugged dust proof sleek enclosure coated with best Quality Powder Coated paint is applied to ensure smooth and lasting finish against corrosive and humid atmosphere.
With the help of our in-depth domain proficiency, we are occupied in offering our valuable clientele a broad range of 3 Phase Changeover ACCL. This offered product is made utilizing exceptional quality material and sophisticated technology. To confirm its performance and elevated quality, offered products are firmly examined on diverse quality constraints.
TIMER-T 1 |
To surpass surge current/initial inrush current of connected load e.g. Tv, refrigerator, fan etc.. |
Very useful to avoid unnecessary switching |
TIMER-T 2 |
Provide delay time in switching on the power supply after overload condition |
Very useful to avoid relay chattering & also gives positive switching to the relay contacts |
TIMER-T 3 |
To provide time delay to avoid switching on all the loads simultaneously |
Very useful to avoid overloading of the generator at its start up time. |